Working Guide to Drilling Equipment and Operations offers a practical guide to drilling technologies and procedures. The book begins by introducing basic concepts such as the functions of drilling muds; types of drilling fluids; testing of drilling systems; and completion and workover fluids. This is followed by discussions of the composition of the drill string; air and gas drilling operations; and directional drilling. The book identifies the factors that should be considered for optimized drilling operations: health, safety, and environment; production capability; and drilling implementation. It explains how to control well pressure. It details the process of fishing, i. e. removal of a fish (part of the drill string that separates from the upper remaining portion of the drill string) or junk (small items of non-drillable metals) from the borehole. The remaining chapters cover the different types of casing and casing string design; well cementing; the proper design of tubing; and the environmental aspects of drilling.
- Drilling and Production Hoisting Equipment
- Hoisting Tool Inspection and Maintenance Procedures
- Pump Performance Charts
- Rotary Table and Bushings
- Rig Maintenance of Drill Collars
- Drilling Bits and Downhole Tools
Inhaltsverzeichnis
1;Front Cover;1 2;Working Guide to Drilling Equipment and Operations;4 3;Copyright;5 4;Full Contents;8 5;Chapter 1. Drilling Muds and Completion Systems;16 5.1;1.1. Functions of Drilling Muds;16 5.2;1.2. Classifications;19 5.3;1.3. Testing of Drilling Systems;20 5.4;1.4. Completion and Workover Fluids;53 5.5;1.5. Safety Aspects of Handling Brines;62 5.6;1.6. Preventing Contamination;65 6;Chapter 2. Drill String: Composition and Design;70 6.1;2.1. Drill Collar;72 6.2;2.2. Drill Pipe;95 6.3;2.3. Drill String Inspection Procedure;201 7;Chapter 3. Air and Gas Drilling;208 7.1;3.1. Bottomhole Pressure;211 7.2;3.2. Minimum Volumetric Flow Rate;215 7.3;3.3. Drill Bit Orifices or Nozzles;215 7.4;3.4. Injection Pressure;216 7.5;3.5. Water Injection;217 7.6;3.6. Saturation of Gas;218 7.7;3.7. Eliminate Stickiness;218 7.8;3.8. Suppression of Hydrocarbon Combustion;220 7.9;3.9. Aerated Drilling (Gasified Fluid Drilling);222 7.10;3.10. Stable Foam Drilling;232 7.11;3.11. Completions Operations;237 7.12;3.12. Compressor and Inert Air Generator Units;241 7.13;3.13. Highly Deviated Well Drilling and Completions;247 7.14;3.14. Downhole Motors;248 8;Chapter 4. Directional Drilling;296 8.1;4.1. Glossary of Terms used in Directional Drilling;296 8.2;4.2. Dogleg Severity (Hole Curvature) Calculations;303 9;Chapter 5. Selection of Drilling Practices;314 9.1;5.1. Health, Safety and Environment;315 9.2;5.2. Production Capacity;318 9.3;5.3. Well Planning and Implementation;319 9.4;5.4. Drilling Implementation;326 9.5;5.5. Post-Run Evaluation;332 10;Chapter 6. Well Pressure Control;334 10.1;6.1. Introduction;334 10.2;6.2. Surface Equipment;335 10.3;6.3. When and How to Close the Well;337 10.4;6.4. Gas-Cut Mud;338 10.5;6.5. The Closed Well;340 10.6;6.6. Kick Control Procedures;341 10.7;6.7. Maximum Casing Pressure;345 10.8;6.8. Maximum Borehole Pressure;347 11;Chapter 7. Fishing Operations and Equipment;350 11.1;7.1. Causes and Prevention;351 11.2;7.2. Pipe Recovery and Free Point;356 11.3;7.
3. Parting the Pipe;358 11.4;7.4. Jars, Bumper Subs and Intensifiers;364 11.5;7.5. Attachment Devices;366 11.6;7.6. Fishing for Junk;378 11.7;7.7. Abandonment;383 11.8;7.8. Wirelines;386 12;Chapter 8. Casing and Casing String Design;400 12.1;8.1. Types of Casing;400 12.2;8.2. Casing Data;408 12.3;8.3. Combination Casing Strings;440 12.4;8.4. Running and Pulling Casing;449 13;Chapter 9. Well Cementing;462 13.1;9.1. Introduction;462 13.2;9.2. Chemistry of Cements;463 13.3;9.3. Cementing Principles;466 13.4;9.4. Standardization and Properties of Cements;468 13.5;9.5. Properties of Cement Slurry and Set Cement;470 13.6;9.6. Cement Additives;480 13.7;9.7. Primary Cementing;489 13.8;9.8. Secondary Cementing;513 14;Chapter 10. Tubing and Tubing String Design;524 14.1;10.1. API Physical Property Specifications;524 14.2;10.2. Running and Pulling Tubing;535 14.3;10.3. Preparation and Inspection before Running;535 14.4;10.4. Packers;553 15;Chapter 11. Environmental Considerations for Drilling Operations;584 15.1;11.1. Introduction;584 15.2;11.2. Well Site;585 15.3;11.3. Environmental Regulations;586 15.4;11.4. Site Assessment and Construction;590 15.5;11.5. Environmental Concerns While in Operation;598 16;Index;610