Managing Systems and Documentation addresses the main systems necessary for the successful operation of a maintenance organization, such as performance control, work control and documentation. It shows how they can be modelled, their function and operating principles, and the main problems encountered in operation. It is the third of three stand-alone companion books with the aim of providing better understanding of maintenance operations, in order to identify problems and prescribe effective solutions. This is one of three stand-alone volumes designed to provide maintenance professionals in any sector with a better understanding of maintenance management, enabling the identification of problems and the delivery of effective solutions. * The third of three stand-alone companion books, focusing on the main systems necessary for the successful operation of a maintenance organization* Covers the maintenance of plant, production and operations assets in industry and service sectors, including manufacturing, food and process engineering, minerals and mining, transport, power and IT* Includes review questions, exercises and case studies* Clearly specified objectives and learning outcomes are given for each chapter, including a route map to link each chapter to the rest of the topics covered
Inhaltsverzeichnis
1;Cover;1 2;Contents;6 3;Preface;12 4;Acknowledgments;14 5;Author's biography;16 6;Part 1 Introductory chapters;18 6.1;1 A business-centered approach to maintenance systems;20 6.1.1;1.1 Introduction;21 6.1.2;1.2 Business-centered maintenance;21 6.1.3;1.3 An example of the application of BCM: background;23 6.1.4;1.4 Part A: Audit of the FPP maintenance department;24 6.1.4.1;1.4.1 Maintenance objectives;25 6.1.4.2;1.4.2 Life plans and preventive schedule;26 6.1.4.3;1.4.3 Workload;28 6.1.4.4;1.4.4 Maintenance organization;29 6.1.4.4.1;Resource structure;29 6.1.4.4.2;Administrative structure;32 6.1.4.5;1.4.5 Maintenance work planning;33 6.1.4.6;1.4.6 Maintenance control system;36 6.1.4.6.1;Maintenance effectiveness;38 6.1.4.6.2;Maintenance organizational efficiency;40 6.1.4.7;1.4.7 Maintenance documentation;40 6.1.4.8;1.4.8 Audit summary;42 6.1.5;1.5 Part B: An alternative maintenance strategy for continuous operation;42 6.1.6;1.6 Part C: A longer-term view of organizational change;43 6.1.7;1.7 The strategic thought process;44 6.1.8;References;45 6.2;2 Introduction to maintenance management systems;50 6.2.1;2.1 The company expressed as a hierarchic systems model;51 6.2.2;2.2 Identifying the maintenance systems;53 6.2.3;References;54 7;Part 2 Budgeting and control;56 7.1;3 Maintenance budgeting;58 7.1.1;3.1 Introduction;59 7.1.2;3.2 Maintenance budgeting;59 7.1.3;3.3 The budgeting procedure;62 7.2;4 Maintenance management control;70 7.2.1;4.1 Introduction;71 7.2.2;4.2 The basics of maintenance management control;72 7.2.3;4.3 Principles of maintenance management control;73 7.2.4;4.4 The control of overall maintenance performance;74 7.2.5;4.5 The control of maintenance effectiveness (the control of plant reliability);78 7.2.5.1;4.5.1 Reactive control of plant reliability;78 7.2.5.2;4.5.2 Pro-active control of unit reliability;79 7.2.6;4.6 The control of organizational efficiency;80 7.2.7;4.7 Incorporating systems into the organization;81 7.2.8;4.8 Published methods for mea
suring maintenance performance;84 7.2.9;4.9 The use of indices of maintenance performance for inter-firm comparisons;84 7.2.10;4.10 Human factors and data collection;84 7.2.11;References;86 8;Part 3 Work planning and work control;88 8.1;5 Short-term work planning and control;90 8.1.1;5.1 Introduction;91 8.1.2;5.2 The fundamentals of work planning;91 8.1.3;5.3 Modeling the operation of a short-term work planning system;92 8.1.3.1;5.3.1 The shift work planning system;96 8.1.3.2;5.3.2 The weekend work planning system;98 8.1.3.3;5.3.3 Feedback of maintenance data for control;99 8.1.4;5.4 Comments on work planning and work control;100 8.1.5;5.5 Guidelines for the design of work planning systems;101 8.1.6;5.6 Safety aspects;105 8.2;6 Management of plant turnarounds Part 1: Network analysis;108 8.2.1;6.1 Introduction;109 8.2.2;6.2 Terms, concepts and definitions in network analysis;110 8.2.3;6.3 The network planning procedure;113 8.2.3.1;6.3.1 Data collection;114 8.2.3.2;6.3.2 Constructing the logic diagram;114 8.2.3.3;6.3.3 Establishing the critical path, floats and overhaul time;116 8.2.3.4;6.3.4 Deriving a bar chart from the network;118 8.2.3.5;6.3.5 Resource histograms;119 8.2.4;6.4 Comments;120 8.3;7 Management of plant turnarounds Part 2: Turnaround methodology;126 8.3.1;7.1 Introduction;127 8.3.2;7.2 Phase 1: Initiating the turnaround;127 8.3.2.1;7.2.1 Forming a policy team and appointing a turnaround manager;127 8.3.2.2;7.2.2 Key policy decisions for the initiation phase;130 8.3.2.3;7.2.3 Selecting a preparation team;131 8.3.2.4;7.2.4 Collecting the job lists and other data;131 8.3.3;7.3 Phase 2: Preparing the turnaround;131 8.3.3.1;7.3.1 Analyzing and validating the workscope;131 8.3.3.2;7.3.2 Freezing the worklist;133 8.3.3.3;7.3.3 Preparing task specifications;133 8.3.3.4;7.3.4 Identifying pre-shutdown work;133 8.3.3.5;7.3.5 Defining contractor work packages and selecting contractors;137 8.3.3.6;7.3.6 Creating the work schedule;137 8.3.3.7;7.3.7 Techniques for c
reating a schedule;137 8.3.3.8;7.3.8 Optimizing the schedule;140 8.3.3.9;7.3.9 Forming the turnaround organization;140 8.3.3.10;7.3.10 Defining the site logistics;142 8.3.3.11;7.3.11 Formulating a cost estimate;142 8.3.3.12;7.3.12 Formulating a safety plan;143 8.3.3.13;7.3.13 Formulation of the quality plan;144 8.3.3.14;7.3.14 Briefing of all turnaround personnel;144 8.3.4;7.4 Phase 3: Executing the turnaround;145 8.3.4.1;7.4.1 The shutdown of the plant;145 8.3.4.2;7.4.2 Carrying out the turnaround tasks;146 8.3.4.3;7.4.3 Defining and costing the extra work;146 8.3.4.4;7.4.4 Defining and costing additional work;146 8.3.4.5;7.4.5 Monitoring progress, productivity, safety, quality and expenditure;146 8.3.4.6;7.4.6 Starting up the plant;147 8.3.5;7.5 Phase 4: Terminating the turnaround;147 9;Part 4 Spare parts management;152 9.1;8 Spare parts management;154 9.1.1;8.1 Introduction;155 9.1.2;8.2 Outline of the stores operation;156 9.1.3;8.3 Inventory policy;159 9.1.3.1;8.3.1 Inventory policy for fast-moving spares;159 9.1.3.2;8.3.2 Inventory policies for the control of slow-moving spares;162 9.1.4;8.4 Management of repairable equipment (rotables);167 9.1.4.1;8.4.1 Introduction;167 9.1.4.2;8.4.2 The rotable system;167 9.1.4.3;8.4.3 Rotable inventory policy: the theory;170 9.1.4.4;8.4.4 Rotable inventory policy: in practice;172 9.1.5;8.5 Inventory policy guidelines;172 9.1.6;8.6 Stores documentation;173 9.1.7;8.7 Stores organization;177 9.1.8;8.8 Stores and rotable performance indices;178 9.1.9;8.9 Summary;179 9.1.10;References;180 10;Part 5 Documentation;182 10.1;9 Maintenance documentation systems: what they are and how they work;184 10.1.1;9.1 Introduction;185 10.1.2;9.2 A functional model;185 10.1.3;9.3 Plant inventory (Module 1);187 10.1.4;9.4 Information base (Element 2);189 10.1.5;9.5 Preventive maintenance schedule (Module 3);194 10.1.6;9.6 Condition monitoring (Module 4);196 10.1.7;9.7 Short-term work planning (Module 5);197 10.1.8;9.8 Long-term work planning (Mod
ule 6);199 10.1.9;9.9 Maintenance control (Module 7);202 10.1.10;9.10 Summary;204 10.1.11;Reference;205 10.2;10 Computerized maintenance information systems: their uses and problems;206 10.2.1;10.1 Introduction;207 10.2.2;10.2 Computerized documentation: historical background;207 10.2.3;10.3 The benefits of computerized maintenance information systems;210 10.2.4;10.4 The problems with computerized maintenance information systems;212 10.2.5;10.5 Summary;213 10.2.6;References;214 11;Part 6 Case study;216 11.1;11 Case study: Maintenance audit of an agricultural chemical plant;218 11.1.1;11.1 Introduction;219 11.1.2;11.2 An overview of Fertec A;219 11.1.3;11.3 Objectives;220 11.1.3.1;11.3.1 Comments on objectives;221 11.1.4;11.4 Maintenance strategy;223 11.1.4.1;11.4.1 Plant-operating characteristics;223 11.1.4.2;11.4.2 Ammonia plant maintenance strategy;223 11.1.4.2.1;Life plan for the SGC;224 11.1.4.2.2;Life plan for pressure vessels;226 11.1.4.2.3;Ancillary equipment;226 11.1.4.2.4;E/I equipment;229 11.1.5;11.5 Maintenance organization;229 11.1.5.1;11.5.1 Introduction;229 11.1.5.2;11.5.2 The maintenance resource structure;229 11.1.5.3;11.5.3 The maintenance administrative structure;232 11.1.6;11.6 Work planning systems;234 11.1.6.1;11.6.1 Short-term work planning, scheduling and control;234 11.1.6.1.1;Comments;238 11.1.6.1.2;Recommendations;238 11.1.6.2;11.6.2 The planning of the major shutdowns;240 11.1.6.2.1;Comments and recommendations;240 11.1.7;11.7 Spare parts management;242 11.1.7.1;11.7.1 Introduction;242 11.1.7.2;11.7.2 Outline of the stores organization and systems;242 11.1.7.2.1;Comments and recommendations;242 11.1.8;11.8 Maintenance control;243 11.1.8.1;11.8.1 The control of overall maintenance performance;243 11.1.8.2;11.8.2 The control of organizational efficiency;243 11.1.8.3;11.8.3 The control of maintenance effectiveness (plant reliability control);244 11.1.9;11.9 Documentation;244 11.1.9.1;11.9.1 Comments and recommendations;245 11.1.10;Reference;2
45 12;Appendix: Weibull analysis;246 12.1;A.1 Weibull analysis of item lifetime;246 12.2;A.2 Weibull probability paper;249 12.3;A.3 A Weibull analysis of a large and complete sample of times-to-failure;249 13;Index;252 13.1;A;252 13.2;B;252 13.3;C;252 13.4;D;252 13.5;E;252 13.6;F;252 13.7;G;253 13.8;H;253 13.9;I;253 13.10;J;253 13.11;K;253 13.12;L;253 13.13;M;253 13.14;N;253 13.15;O;253 13.16;P;254 13.17;R;254 13.18;S;254 13.19;T;254 13.20;W;255 13.21;Z;255